Back to All Events
THIS IS PART 1 OF 3
Trainer: Mike Krol
Mandatory Attendees (Drywall Group 1):
Emmanuel Risbrook
Felix Rodriguez Velasquez
Jose Ruiz Iglesia
Saesha Moise
Video Capture: Alissha Gordin
Materials: Frank Lugo
Location: MLC Yard
Start Time: 5:00 AM
End Time: 7:00 AM
___________________________________________________________________________________
AGENDA
DAY 1 OF 3
Task / Topic Description
Safety (PEE, Hazards, Preventative Measures)
Preparation of Workspace
Drywall Hanging
Drywall Finishing – Part 1
Quality Control Checks
Housekeeping
**** This training will be recorded for future reference.****